Swedish North Tower, Seattle, WA (2025)

Shoring System: Temporary Anchored Soldier Piles

Client: Malcolm Drilling Company, Inc

General Contractor: Mortenson Construction

Shoring Contractor: Malcolm Drilling Company, Inc.

Shoring Face Area: 45,000 Square Feet

Wall Depth Range: Up to 60 feet

Status: Completed 2025

The project development included a high-rise medical tower on the existing Swedish Hospital campus. Construction involved the demolition of existing buildings within the new building footprint, and the shoring of existing hospital buildings on the east and south sides of the new structure. This involved the underpinning and support of heavily loaded footings immediately adjacent the new construction. Deformations were limited to less than 0.5 inches adjacent the existing structures and less than 1 inch adjacent the city right-of-way.

Ground Support PLLC

15704 NE 157th St, Woodinville, WA, USA

425-922-1501

Copyright © 2026 Ground Support PLLC - All Rights Reserved.

Powered by

This website uses cookies.

We use cookies to analyze website traffic and optimize your website experience. By accepting our use of cookies, your data will be aggregated with all other user data.

Accept