Ground Support
Ground Support
  • Home
  • About Us
  • Projects
  • More
    • Home
    • About Us
    • Projects
  • Home
  • About Us
  • Projects

Maple Valley Retaining Wall, Maple Valley, WA (2022)

Shoring System: Permanent Soil Nail and Anchored Soldier Pile Retaining Walls

Client: Terra Associates, Inc.

General Contractor: Sierra Construction Company, Inc.

Shoring Contractor: DBM Contractors Inc.

Shoring Face Area: 60,000 Square Feet

Wall Depth Range: Up to 50 feet

Status: Completed 2022


The project consisted of the reclamation of sand and gravel open pit excavation to develop the site for surface parking and a commercial building. To do this, permanent retaining walls were required in the pit sidewalls that consisted of both native soils and reclamation fills. Two different retaining wall systems were used, depending on the nature of the soil conditions encountered. Where compacted fill soils were to be retained, permanent anchored soldier pile walls were used together with a permanent shotcrete facing attached to the soldier piles. Wall heights were up to 41 feet and a total wall surface area of 22,000 square feet was used. Where native soils were to be retained, permanent soil nails walls were used. Wall heights were up to 50 feet and a total wall surface area of 38,000 square feet was used. The wall was finished with a painted and carved shotcrete fascia.

Ground Support PLLC

15704 NE 157th St, Woodinville, WA, USA

425-922-1501

Copyright © 2026 Ground Support PLLC - All Rights Reserved.

Powered by

This website uses cookies.

We use cookies to analyze website traffic and optimize your website experience. By accepting our use of cookies, your data will be aggregated with all other user data.

Accept